搜索关注在线英语听力室公众号:tingroom,领取免费英语资料大礼包。
(单词翻译)
There's something curiously1 similar in the way Governor Rick Snyder handled negotiations2 for the new Detroit River bridge at the beginning of his administration, and the proposed deal announced yesterday with Enbridge on the future of Line 5, the oil pipeline3 that runs under the Straits if Mackinac.
In both cases, he seems to have decided4 the legislature was essentially5 dysfunctional, and went ahead and made his own deal. That assessment6 was certainly accurate in the case of the bridge. Whether that's true in the case of Enbridge isn't clear, but what this agreement does do is allow the governor's office to keep control of the process during the next few stages.
By the way, it would be easy to see the deal with Enbridge as meaning more than it does. This doesn't mean the company is agreeing to shut down Line 5, ever.
Essentially, all the Canadian-based firm is agreeing to do is take the section of Line 5 in the St. Clair River and move it to a tunnel under the river.
If it makes you feel better, Enbridge is also promising7 to shut down Line 5 anytime there is a storm that lasts at least an hour and produces waves more than eight feet, which sounds like a disaster movie to me. Oh, and they will "study" what to do about the twin pipelines8 under the Straits of Mackinac, and submit a report to the state by next June 15.
The timing9 makes a certain amount of sense in one way.
Primary campaigns for every state office will be fast and furious next June. The one place relatively10 insulated from election-year politics may be the term-limited governor's office. But while Mr. Snyder may be able to be dispassionate, he will also be a lame11 duck. If Enbridge doesn't like what Snyder ends up proposing, well, he will be gone forever less than six months later.
The company could stall, and take their chances on a better deal with the next governor. On the other hand, this may give Snyder more power and more leverage12. You can imagine him saying, "you may not love my terms, but if Gretchen Whitmer is the next governor, she's going to do everything she can to shut Line 5 down."
As far as yesterday's agreement, it is significant that Michigan Attorney General Bill Schuette thought it was just great, while the environmental groups I heard from think it is just horrible. Food and Water Watch said, for example, that this was "a false solution meant to distract from a real solution."
I don't claim to be an environmental engineer, but I do know these things: If Enbridge's 64-year-old Line 5 were to break, Lakes Huron and Michigan could be damaged beyond repair.
I also know the company was not truthful13 at first about the extent of damage to the safety coatings on Line 5. Plus, when Enbridge's line near the Kalamazoo River broke seven years ago, incompetent14 operators assumed it was only clogged15, and tried to force more crude oil through it. I think we need to err16 on the side of safety, and I'm not sure this deal gets us there.
Jack17 Lessenberry is Michigan Radio's Senior Political Analyst18. Views expressed in his essays are his own and do not necessarily reflect those of Michigan Radio, its management or the station licensee, The University of Michigan.
本文本内容来源于互联网抓取和网友提交,仅供参考,部分栏目没有内容,如果您有更合适的内容,欢迎 点击提交 分享给大家。